Moodist Hospital
Health
At Moodist Psychiatry and Neurology Hospital, the existing reinforced concrete roof was replaced with a new steel-framed roof-level extension while healthcare services continued. The project includes patient rooms, shared spaces and therapy balconies connecting the interiors with the outdoors.
A key stage was cutting and lifting approximately 60 tonnes of concrete roof from the building using cranes. Temporary protection systems sheltered the existing clinical areas from rain and wind while the roof was open. Demolition, material handling and construction were planned around the hospital’s daily use.
Koloni Architecture’s scope covered project design, shop and fabrication drawings, turnkey delivery and construction for the roof-level extension. Architectural details for the new steel-framed level were considered alongside ceilings, partitions, electrical and mechanical services and protective balcony elements. Construction was completed in less than four months.
The gallery opens with photographs of the completed extension, patient room, balcony and shared spaces. Technical illustrations explain the roof intervention, followed by selected construction records. The final two images are design renderings.
At Moodist Psychiatry and Neurology Hospital, the existing reinforced concrete roof was replaced with a new steel-framed roof-level extension while healthcare services continued. The project includes patient rooms, shared spaces and therapy balconies connecting the interiors with the outdoors.
A key stage was cutting and lifting approximately 60 tonnes of concrete roof from the building using cranes. Temporary protection systems sheltered the existing clinical areas from rain and wind while the roof was open. Demolition, material handling and construction were planned around the hospital’s daily use.
Koloni Architecture’s scope covered project design, shop and fabrication drawings, turnkey delivery and construction for the roof-level extension. Architectural details for the new steel-framed level were considered alongside ceilings, partitions, electrical and mechanical services and protective balcony elements. Construction was completed in less than four months.